Selected Projects
Columbus City Schools – Arts Impact Middle School
This project features cutting edge mechanical, electrical, plumbing and technology engineering designs for the new 78,145 ft² Arts Impact Middle School. The school features dance, art and performing arts studios as well as a computer lab.
Princeton Local Schools – Evendale Elementary School
This new 56,000 ft² elementary school features spacious classrooms and cutting edge mechanical, electrical, fire protection and technology systems. The school is furnished with a complete fire suppression system utilizing an automatic wet sprinkler system in accordance with the requirements of all regulatory water mains to ensure that proper flows are available for the sprinkler system and hose connections. The HVAC s (continued)
Columbus City School – Oakmont Elementary School
Dynamix Engineering designed the mechanical, electrical, plumbing and technology systems for a new 45,977 ft², K-5 elementary school. The facility was designed to fit into a highly residential area. Mechanical systems were designed to be less obstructive to the neighborhood. In addition, the lighting design took advantage of the natural light in the main corridor.
The Ohio State University – Early Childhood Development Center at Weinland Park
Dynamix Engineering provided mechanical, electrical, plumbing and technology engineering to the Early Childhood Development Center at Weinland Park. The facility relocated and expanded its laboratory and serves 80 infants, toddlers, and preschoolers. Students majoring in early childhood development and education attend classes in this facility.
The space includes indoor and outdoor classrooms, off (continued)
Dayton Department of Veteran Affairs – GI Clinic Expansion, Outpatient Pharmacy and Prime Care Clinic
This project requires Dynamix to construct an approximate 17,000 ft² addition to Building 340 for the purpose of expanding the Primary Care Clinic and expanding the Outpatient Pharmacy. The project also requires Dynamix to renovate the Gastroenterology (GI) Clinic areas and adjacent spaces on the first floor of Building 330 in order to expand the GI Clinic operations.
The pharmacy (continued)
